服务热线
020-84061578
Horizontal spiral powder mixer
100L Emulsifier Customized
The Tube Emulsifier is used for pharmaceutical industry, food industry, paint and ink, manometer materials, petrochemical industry.The Tube Emulsifier is the very good machine for small workshop to produce different kinds of liquid products, it sells very well in Africa, Asia markets.
Item | HY-LD100 |
Product Name | 100L Emulsifier Customized |
Volume | 100L |
Emulsification motor power | 0.55KW |
Voltage | 220V |
Water treatment motor power | 0.37KW |
Agitation motor power | 0.75KW |
Capacity | 100kg/half hour,200kg/hour |
Heating power | 6KW |
Dimension | 1.3*0.75*1.65(M) |
Machine Weight | 200 kg |
Certificates | TUV ISO GMP |
Shipping | 3-7 days for Stock Equipment,15-30 days lead time for customized Equipment. By Sea or air freight etc. |
High Productivity.
Fast Delivery.
Leading Level R & D Department.
Excellent After-sales Service we can offer.
Our factory locates near Guangzhou Baiyun International Airport,China.
One year warranty of the whole machine, life-span maintenance.
Our engineers will train your staff to
operate it during the period of installation and commissioning, and they
will not leave there until your staff can operate it properly and
normally.
Any malfunction happened, once you enquiry us, we will reply you within 48 hours except the special reasons.
1. Can I have my own customized product?
A1:Yes, your customized requirements for logo, design and mark etc.are very welcome.
2.Where your factory are located in? How can I get there?
A2: Guangzhou Yuanyang Mechanical Device Co.,Ltd locates near the convenient Guangzhou Baiyun International Airport or metro line 3 to Qingbu station.
3.How does your factory regard of quality control?
A3: Quality is the first. All over the world those customers who have established business relationships with our factory give a high appraisal to Yuanyang Mechancial Co.,Ltd and we take highly sight of quality control from the beginning to the end, we will supervise if equipment function well before delivery,our factory had have gained TUV and ISO authentication certificate.
4.When is your delivery time?
A4: In stock product: 1-5 working days after receiving the payment.Custom-made product: 20-40 working days after receiving the payment(according to your quantity).